I'm a student in Gainesville and I've been noticing a significant increase in Cox vans in our area installing lots of new nodes and refreshing old nodes.
Maybe I'm being optimistic but perhaps Cox is preparing to deploy SDV in the Gainesville network as well. We have rather sparse HD offerings here.
Reader Comments (Page 1 of 1)
NaterGator @ Aug 24th 2007 12:55PM
I'm a student in Gainesville and I've been noticing a significant increase in Cox vans in our area installing lots of new nodes and refreshing old nodes.
Maybe I'm being optimistic but perhaps Cox is preparing to deploy SDV in the Gainesville network as well. We have rather sparse HD offerings here.
Phour ZwanZig @ Aug 25th 2007 3:22AM
Yeah they most likely will/are.. SDV requires smaller nodes, so splittin is required.. Usually done in late to early hours.. 2-4 am or so..